WCC 2020 Res 008 - Activity Report

General Information

Resolution
49147
IUCN Constituent
IUCN WCPA Freshwater : Network 2021-2025
Period covered
Geographic scope
European Union (EU)
Country/Territory
Romania

Actors involved in implementing this Resolution:

IUCN Members
No other Members are/have been involved
IUCN Commissions
No Commissions are/have been involved
IUCN Secretariat
No
Other non-IUCN related organisations
Asociația Declic, WWF

II. Implementation

Activities carried out to implement this Resolution
Activity
Field activities
Description and results/achievements of activities:
Western Jiu River represents the upper reaches of Jiu River, the only big mountain river which still flows free in Romanian Carpathians. Western Jiu River is a very important river, due to its unique characteristics. It is placed between Retezat National Park and Jiu Gorge National Park, thus constituting a very important green corridor. It is one of the very few rivers with substantial flow from Romania still having a natural flow, not diminished by hydropower developments. Western Jiu River is the habitat of several protected species and provides significant ecosystem services to the inhabitants of the four towns it passes through, Uricani, Lupeni Vulcan and Aninoasa. Despite its ecological importance, the protection of the river is completely neglected by the Jiu Basin Water Administration, in defiance of the public pressure demanding the protection of this emblematic river. The lower stretch of the river was poisoned in August 2021, thousands of dead fish floated downstream. But the worst danger for the river lies ahead, is represented by a devastating river regulation project. The project is called: “Securing the Valea de Pești dam, Hunedoara County”.
The project is aimed to be financed from EU funds and represents an utter breaching of Water Framework Directive. Based on two fake studies (EIA and Impact on the Water Body Assessment), the Hunedoara County Environmental Agency issued a draft of an environmental permit.
The significant negative impact of this river regulation project is mentioned in the report of the ”Living Rivers Europe” coalition, called THE FINAL SPRINT FOR EUROPE’S RIVERS, at page 71.
Considering the status of the institutional framework in Romania, a lawsuit will be needed to stop this ecocide. Fieldwork is needed in order to challenge the two fake studies mentioned above.
Status
On-going
Describe any challenges encountered in implementing this Resolution and the measures taken
The conflict of interests which governs the water management in Romania, which causes the total refuse of the authorities with regard to adopting the paradigm shift in water management which took place in the rest of Europe.
Please report on the result /achievement of the actions taken
By field work several data were gathered, dismissing the allegations in the fake studies mentioned above. But the two threatened water bodies on Western Jiu and some of its tributaries need more field research.
Identify and briefly describe what future actions/activities are planned for the implementation of this Resolution
Future action / activity
Other
Description
The only future action with real chances to save Western Jiu River is a lawsuit to annull the environmental permit.

III. Additional Information

Upload document
Western Jiu.jpg (7.82 MB)
Report status
Published